Overland Pipelines : Multi-Purpose Pipelines
SECUNDA NATREF INTEGRATION PIPELINE
SOUTH AFRICA | SASOL TECHNOLOGY (Pty) LTDDESCRIPTION
Engineering (feasibility, basic and detail), Procurement and Construction Management of a 145 kilometer, high pressure, 10” welded steel, pumped, multi-product pipeline between Secunda and Sasolburg, South Africa, including pump stations, process control flow metering stations and leak detection system.VGI’S SCOPE
Project Management, Procurement, Construction Management, Mechanical Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil Engineering, Process Engineering, Geotechnical Studies, Land Surveying and Wetland delineation.VALUE OF SERVICES
R123 millionPROJECT COMPLETED
October 2012RESOURCES
VGI Project Director: Ian Grobler VGI Senior Pipeline Engineer and Project Manager: Stefan Grové VGI Senior Civil Engineer: Johan Pretorius VGI Mechanical Engineer (Pump Stations & Transient Flow Analysis): Charl van den Berg VGI GIS Specialist: Anita NaudéPARTNERS
IPES AVEC Global Geomatics CTC

SECUNDA TANK FARM: OWN PIPELINE REPLACEMENT
SOUTH AFRICA | SASOL TECHNOLOGY (Pty) LTDDESCRIPTION
The project consisted of two new 5,2 km 12” fuel pipelines between the Sasol Oil Secunda Fuel Depot and the Transnet Pipelines Pump Station in Secunda. A new above ground PIG launcher and surge protection station was constructed adjacent to the Transnet Pipelines Pump Station.VGI’S SCOPE
Project Management, Procurement, Construction Management, Mechanical Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil Engineering, Process Engineering, Hydraulic Analysis, Land Surveying.VALUE OF SERVICES
R15.4 millionPROJECT COMPLETED
July 2013RESOURCES
VGI Senior Pipeline Engineer and Project Manager: Johan Pretorius VGI Mechanical Engineer: Louis FerreiraPARTNERS
IPES Global Geomatics CTC
REPLACEMENT OF 7 TRANSFER PIPELINES FOR SAPREFF
SOUTH AFRICA | LNG, DIESEL, AVGAS | WBHODESCRIPTION
The project entailed the design and construction of a 6 inch and an 8 inch pipeline, with lengths of approximately 1500 m and 650 m respectively. The oil pipeline transports product at 150 DC. The other pipeline transports LPG. The project also included aboveground pipelines with expansion loops and 7 underground pipelines located in the same servitude as the existing 7 pipelines which remained in operation during construction. Existing structures such as pipe bridges had to be re-enforced and re-habilitated.VGI’S SCOPE
VGI was the responsible Engineering Consultancy for the detailed civil, structural and mechanical design of the underground replacement lines for WBHO.VALUE OF SERVICES
R7.9 millionPROJECT COMPLETED
June 2008RESOURCES
VGI Senior Pipeline Engineer and Project Manager: Jan Venter